Public Disclosure of Clean Production Audit Information of Henan Jinpeng Chemical Co., Ltd. (2025)
Pubdate:2025/12/04
Views:48
This round of cleaner production audit lasted 10 months, generating a total of 20 cleaner production proposals. After careful study, comparison, and screening, 19 feasible proposals and 1 ongoing cleaner production proposal were confirmed. Among the feasible proposals, 17 were no/low-cost options requiring little to no economic investment or minimal investment, while 2 were medium/high-cost options requiring relatively larger investments. As of the completion of this report, all proposals have been fully implemented, achieving an implementation rate of 100%. The total investment for the implemented proposals amounted to 5.3521 million yuan, resulting in annual cost savings of 1.3855 million yuan, annual electricity savings of 344,600 kWh, annual reduction of CO2 emissions by 208.77 tons, annual water savings of 1,344 tons, annual reduction of wastewater discharge by 1,119.6 tons, annual steam savings of 1,460 tons, and an annual reduction of hazardous waste salt by 66 tons, among other benefits. The benefits generated from the implementation of this round of cleaner production proposals are summarized in the table below: